CYB 205 Infrastructure Administration
Q: Which one of the following metrics specifies the amount of time that business continuity planners find acceptable for the restoration of service after a disaster?
A: RTO
Explanation: The recovery time objective (RTO) specifies the amount of time that business continuity planners find acceptable for the restoration of service after a disaster. It is the time by which the systems must be restored to normal operational function after the occurrence of the risk event.Answer B is incorrect. The exposure factor (EF) is the fraction of the value of the asset, process, or outcome that will be lost from a single occurrence of the risk event.Answer D is incorrect. The single loss expectancy (SLE) is the total direct and indirect costs (or losses) from a single occurrence of a risk event.Answer C is incorrect. The maximum allowable outage (MAO) is the greatest time period that business operations can be allowed to be disrupted by a risk event.
- Get link
- X
- Other Apps
Comments
Post a Comment