 CYB 205 Infrastructure Administration

Q: Chris is conducting a risk assessment for his organization and has determined the amount of damage that a single flood could be expected to cause to his facilities. What metric has Chris identified?

A: SLE

Explanation: Chris has identified the single loss expectancy (SLE), which is the amount of damage that risk is expected to cause each time that it occurs. It is the total direct and indirect costs (or losses) from a single occurrence of a risk event.Answer D is incorrect. The recovery point objective (RPO) measures the data loss that is tolerable to the organization.Answer B is incorrect. The annual rate of occurrence (ARO) is an estimate of how many times per year a particular risk is considered likely to occur.Answer A is incorrect. The maximum allowable outage (MAO) is the greatest time period that business operations can be allowed to be disrupted by the risk event.

Comments

Popular posts from this blog

NTC/362: Fundamentals of Networking